REBUILT INJECTOR #8 99.5-03 AE

$205.16

-

2 in stock

SKU: AP63904AE

Core Charge: $100.00
*Core Charge Return Check List

Category: Tag: Brand:

Product Description

Rebuilt AE Pure Power Injector 1999.5-03 7.3 L Ford Powerstroke, Cackle Fix

Rebuilt AE code injector for # 8 cylinder. Cackle fix or long lead injector for 99.5-03 7.3 engine built after 12/7/1998.

Part Numbers: 5C3Z9VE527ARM, 5C3Z9VE527ERM, XC3Z9E527AARM, 1833640C1, 5010148R91, 1833646C92, 1833639C1, CMR-7-RM, 7003-PP, AP63904AE

Fits: 7.3 PU and E vans 199.5, 2000, 2001, 2003

Part Number: AP63904AE

Additional information

Weight3.5 lbs
Brand

Part NumberAP63904AE
Warning

Warning:

Alliant Power P65 Warnings

For plastic only or brass and plastic

  • Warning: This product can expose you to chemicals including lead, which is known to the State of California to cause cancer, and Bisphenol A, which is known to the State of California to cause birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov

For brass only

  • Warning: This product can expose you to chemicals including lead, which is known to the State of California to cause cancer, and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov

For coated wires or o-rings or rubber seals/gaskets

  • Warning: This product can expose you to chemicals including Di(2-ethylhexyl)phthalate (DEHP), which is known to the State of California to cause cancer, and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov

Injectors – Coated wires/plastic/brass/o-rings

  • Warning: This product can expose you to chemicals including lead, which is known to the State of California to cause cancer, and Bisphenol A, which is known to the State of California to cause birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov

Reviews

There are no reviews yet.

Be the first to review “REBUILT INJECTOR #8 99.5-03 AE”

Your email address will not be published. Required fields are marked *

You may also like…