NEW AE INJECTOR, 99.5-03 FORD 7.3

$326.94

-

2 in stock

SKU: AP63804AE

Core Charge: $100.00
*Core Charge Return Check List

Category: Tag: Brand:

Product Description

New Alliant Power AE Injector 1999.5-03 7.3 L Ford Powerstroke, Cackle Fix

New OE AE code HEUI injector for # 8 cylinder. Cackle fix or long lead injector for 99.5-03 7.3 engine built after 12/7/1998. Refer to TSB 03-21-39 for further information.

Part Numbers: 5C3Z9VE527ARM, 5C3Z9VE527ERM, XC3Z9E527AARM, 1833640C1, 5010148R91, 1833646C92, 1833639C1, CMR-7-RM

Fits: 7.3 PU and E vans 1999.5, 2000, 2001, 2003

Alliant Power 36 month unlimited mileage warranty on Ford applications

Part Number: AP63804AE

Additional information

Weight3.5 lbs
Brand

Part NumberAP63804AE
Warning

Warning:

Alliant Power P65 Warnings

For plastic only or brass and plastic

  • Warning: This product can expose you to chemicals including lead, which is known to the State of California to cause cancer, and Bisphenol A, which is known to the State of California to cause birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov

For brass only

  • Warning: This product can expose you to chemicals including lead, which is known to the State of California to cause cancer, and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov

For coated wires or o-rings or rubber seals/gaskets

  • Warning: This product can expose you to chemicals including Di(2-ethylhexyl)phthalate (DEHP), which is known to the State of California to cause cancer, and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov

Injectors – Coated wires/plastic/brass/o-rings

  • Warning: This product can expose you to chemicals including lead, which is known to the State of California to cause cancer, and Bisphenol A, which is known to the State of California to cause birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov

Reviews

There are no reviews yet.

Be the first to review “NEW AE INJECTOR, 99.5-03 FORD 7.3”

Your email address will not be published. Required fields are marked *

You may also like…